Project Name: Piping Stress Analysis
Client: PetroProcess System, Singapore
Engineering Contractor: Worley Parsons
Project Scope:
Pipe Stress Analysis using CAESAR II, of the Pre Treatment Skid of SEPAREX MEMBRANE System. The analysis was performed to obtain:
- The piping system stress distribution
- Component displacement
- Various Support loads / reactions
- Nozzle loads
- Hydro test load cases and their combinations through the entire life of the piping system.